Experience and credibility in counseling and consulting of public projects.

Our experience
Integral structuring of road infrastructure projects

Objective

- PROJECT 1. Integral structuring for the improvement of the road between the head of the municipality of Ovejas (Sucre), passing through the La Ceiba district of the town of Chalán (Sucre) and the road stretch between the Salitral of the municipality of Ovejas, The site called Punta de Plancha in Raizal of the municipality of Carmen de Bolívar (Bolívar). (28.7 Km. Approximate total) - PROJECT 2. Integral structure for the improvement of the Macayepo - El Limón - El Floral Road in the Carmen de Bolívar (Bolívar) and environmental impact studies via horseshoe The Flora- Santo Domingo de Meza in the Carmen de Bolívar (Bolívar) . (15 km approximate total) - PROJECT 3.Integral structure for the improvement of the tertiary road that connects the municipality of Cabuyaro with the Humea bridge, in the municipality of Puerto López. (35 km approximate total) - PROJECT 4. Integral structuring for the improvement of the route 25Vl22 Puerto Frazadas (Tuluá) -Barragán (Tuluá) - La Unión (Tuluá and Sevilla) - limits with Tolima (municipality of Roncesvalles - Páramo de Barragán) and improvement of Via 40VL04 La Unión (Seville) -Cruise (Seville) - Cumbarco (Seville). (110 km approximate total)


Contracting Entity

Fondo Financiero de Proyectos de Desarrollo  - FONADE

Year of execution

2017 - 2017